Vurdering av prosjektlokasjonsdesign

Vennligst fyll ut PLDA-en så grundig som mulig for din prosjektdesignforespørsel.

Dette feltet er for valideringsformål og skal stå uendret.

DISTRIBUTOR DETAILS

Name(Påkrevd)

PROJECT – LOCATION DETAILS

Name
Project Address(Påkrevd)

PROJECT – APPLICATION DETAILS

Surface to be Illuminated
Project Width
Project Length
 
Project Environment-Select applicable(Påkrevd)
Lighting to Code/Standard(Påkrevd)
Illumination Levels if Code/Standard is Required
*Ave Lux/Fc (Eav)
*Min Lux/Fc (Eph)
*Uniformity (Up)
 

PROJECT – PRODUCT TYPE

PROJECT – SITE INFORMATION

Date You Are Inspecting the Installation Site?
Site Inspected at:
The site should be inspected at three separate intervals: 9am – 12pm – 3pm
What Direction Does Your Project Run Predominantly
High Powered Overhead Lighting Close to or Over Site
Any Trees or Structures Near the Site
Future Structures or Landscaping Expected
Dra og slipp filer her, eller
Godkjente filtyper: jpg, png, pdf, Max. file size: 50 MB.
    Solar Bollard Lighting
    Oversikt over personvern

    Dette nettstedet bruker informasjonskapsler slik at vi kan gi deg best mulig brukeropplevelse. Informasjon om informasjonskapsler lagres i nettleseren din og utfører funksjoner som å gjenkjenne deg når du kommer tilbake til nettstedet vårt og hjelpe teamet vårt med å forstå hvilke deler av nettstedet du synes er mest interessante og nyttige.